LSTmarina.com
LSTmarina.com
  • Welcome & About Us
  • Marina Rebuild Info
  • President Dave's BLOG
  • SLIPS for SALE or RENT
  • Boat items FOR SALE!
  • Marina Rules & Regs
  • Overview - Marina & Slips
  • LST Photo Overview
  • Video Overview of Racine
  • Racine LINKS
  • Upcoming Marina Events
  • LST Marina History
  • Our Board & Staff
  • Pier Party Pics
  • FAQ
  • Member - Marina ROSTER
  • Member - Financials
  • Member- BUDGETS (2024-25)
  • Member - Meeting Minutes
  • Member - Bylaws
  • Member - FAQs
  • More
    • Welcome & About Us
    • Marina Rebuild Info
    • President Dave's BLOG
    • SLIPS for SALE or RENT
    • Boat items FOR SALE!
    • Marina Rules & Regs
    • Overview - Marina & Slips
    • LST Photo Overview
    • Video Overview of Racine
    • Racine LINKS
    • Upcoming Marina Events
    • LST Marina History
    • Our Board & Staff
    • Pier Party Pics
    • FAQ
    • Member - Marina ROSTER
    • Member - Financials
    • Member- BUDGETS (2024-25)
    • Member - Meeting Minutes
    • Member - Bylaws
    • Member - FAQs
  • Sign In

  • My Account
  • Signed in as:

  • filler@godaddy.com


  • My Account
  • Sign out

Signed in as:

filler@godaddy.com

  • Welcome & About Us
  • Marina Rebuild Info
  • President Dave's BLOG
  • SLIPS for SALE or RENT
  • Boat items FOR SALE!
  • Marina Rules & Regs
  • Overview - Marina & Slips
  • LST Photo Overview
  • Video Overview of Racine
  • Racine LINKS
  • Upcoming Marina Events
  • LST Marina History
  • Our Board & Staff
  • Pier Party Pics
  • FAQ
  • Member - Marina ROSTER
  • Member - Financials
  • Member- BUDGETS (2024-25)
  • Member - Meeting Minutes
  • Member - Bylaws
  • Member - FAQs

Account


  • My Account
  • Sign out


  • Sign In
  • My Account

LST Marina Rebuild Timeline

This is the initial proposed timeline. SEE BELOW FOR PHOTOS AND VIDEOS!

Download PDF

Progress is being made on the NEW Pier Installation – March 17 - 26, 2025

    the FIRST pier went into the Root River on March 13, 2025!

    The FIRST pier was dropped into the water

    New Piers are arriving in Racine – Monday, March 10, 2025

    The finger piers have arrived at Belle Harbor in Racine and will be floated to LakeShore Towers Marina this week! 

    Spring is in the air!

    New Finger Pier!

    The new Piers are here and have landed at Belle Harbor. They will be floated to LakeShore Towers Marina for installation!

    President Dave's BLOG

    LST Marina – Patiently Waiting for SPRING Time!

    Check out this great drone footage Dave took of our Marina without piers! 

    LakeShore Towers Marina - February 2025 photograph

    LSTMarina in Wintertime

    The marina is frozen over and it looks very stark without any piers. I'm sure everyone is hoping for an early "ice out" to get the new piers in as soon as possible this Spring!

    About LST Marina

    Dock Removal Videos

    Gangway Removal

    Removing the "gangway" was one of the trickier pieces to maneuver with the crane!

    Dock removal nearing completion.

    This hard working crew did an amazing job of taking out the old piers under all kinds of conditions – including rain and snow – but they just kept on working!

    Lifting an entire dock!

    Section by section, the removal crew worked as a team to remove the sections from the marina, float them to Belle Harbor and lifted them out to dry before piers will be transported to the land fill!

    Drying out at Belle Harbor

    As this video shows, the docks were full of water. They will dry out for a couple weeks to lighten the load when they're hauled to the land fill!

    Moving docks to Belle Harbor!

    30+ knot winds, 32 degrees and snowing. Can’t say enough about this hard working crew. 

    LST Marina DOCK REMOVAL - RAIN OR SHINE -November 18-20, 2024!

      Docks are ready and waiting to be hauled to the land fill!

      An amazing crew dismantled, floated and ifted all the old LST Marina piers and they're now drying out at Belle Harbor in Racine, WI!

      Fall 2024 - Preliminary equipment set up is underway at Belle Harbor for LST Dock Removal!


        Fall 2024 - Set up for DOCK removal is underway!

        Cart with one of the final loads of wiring.

          Fall 2024 - Preliminary stages of dock demolition is underway!

          Cart with one of the final loads of wiring.

            Work begins on the marina Summer 2024 as an underwater diver comes in to remove spud poles before the rebuild commences on LSTMarina!

            Photos of WHY the marina is being rebuilt!

            Download PDF

            Copyright © 2025 LSTMarina.com (Lakeshore Towers Marina) - All Rights Reserved.

            Powered by

            • Overview - Marina & Slips

            Our NEW piers are installed & utility work is underway!

            Thanks to the efforts of the hardworking installation crew, our brand NEW piers are installed and utility work is underway! See all the photos BELOW and in President Dave's BLOG!